Rifacimento del reparto 65kV presso la cabina primaria di Cardano.
Edyna s.r.l. – Bolzano

Renovation of the 65 kV department at the Cardano primary substation

Preliminary and final design, works management and coordination for safety during the design phase
Project: 2015
Work: 2017
Progress: work completed; cabin in service

Complete renovation of the 65 kV department of the Cardano primary substation and related protection and control system, by replacing the existing GIS with a new GIS module, consisting of a single busbar with bus-tie, two cable line arrivals and three overhead line arrivals.

Including renovation of the cable lines connecting to the 65/20 kV (for distribution) and 220/65 kV (Terna-owned) transformers.

The assignment included: structural verification and related adaptation of the line arrival portal for the insertion of the third line, drafting of the definitive project aimed at issuing an integrated contract.