ACSM S.p.A. Fiera di Primiero (TN)

Switching to compensated neutral of the MV network relating to the Castelpietra HV/MV station

Sum total of the work: € 350.000,00
Project: 2012-2013
Progress: work completed

Transition of the medium voltage distribution network relating to the Castelpietra power station from isolated neutral to compensated neutral, through the installation of two Petersen coils connected with a neutral forming transformer (TFN) to the relevant MV half-busbar. 

The project, in addition to the technical solutions, envisaged the implementation methods, which will be: turnkey contract for the executive design, supply and installation of the electromechanical works; assignment in the economy of construction works