Opere di connessione per nuova centrale idroelettrica ad acqua fluente da 240 kW
Fluente s.r.l. – Cividale del Friuli (UD)

Connection works for new 240 kW run-of-river hydroelectric power plant

Preliminary and executive project, operational site management of civil and electrical works for connection to the distribution network. Drafting of connection and authorization practices for works
Sum total of the work: € 150.000,00
Project: 2016 – 2017
Work: 2017 – completed
Progress: under construction (50%)

Construction of connection works for the new hydroelectric power plant on the Natisone river with a power of 240 kW, including:

  • new delivery/distribution/transformation cabin within a prefabricated reinforced concrete room, including electromechanical setup of the user cabin room and E-distribuzione room
  • construction of a new underground ducted cable duct with 3x(1×185) mm2 aluminum conductors for a total length of approximately 700 m (double in-out line)