Opere di connessione nuovo Data Center a Noviglio (MI)
Develog 5 S.r.l.

Connection works for the new Data Center in Noviglio (MI)

Authorization project for connection works (132/30 kV user substation and double line in 132 kV underground cable)
Project: 2021
Progress: approved

Design of connection works for passive users (data centers) with a power of 100 MW.

 Double line in 132 kV underground cable with a 4.5 km route in rural and urban routes across 4 municipalities, including interference study (provincial and motorway roads; waterways)

132/30 kV air-insulated substation, composed of a single busbar, two line arrival uprights, 3 transformer uprights

Including assistance at the bodies responsible for issuing permits