New substation and underground cable connection to a photovoltaic system in Sicily

Executive project of the electromechanical works for the 150 kV cable line and connection transformation cabin for the photovoltaic system in Aidone (EN)
Project: 2021
Progress: completed

Creation of connection works to the national grid for a 41 MW photovoltaic system 

  • New user substation with air insulation, including a line arrival bay, a 150/20 kV 40/50MVA transformer bay and auxiliary services
  • 150 kV underground cable line for a total length of 3.8 km according to the crossbonding system

Services included: cable sizing; study of electromagnetic fields