Rifacimento della Cabina Primaria 132/20kV di Molini di Tures (BZ).
Edyna s.r.l – Bolzano

Renovation work on the primary cabin of Molini di Tures (Campo Tures – BZ)

Executive project, works management, safety coordination in the design phase for the complete renovation of an existing cabin in operation
Sum total of the work: € 3.770.000,00
Project: 2012-2013
Work: 2014 – 2016
Progress: work completed; cabin in operation

Renovation in phases on the same site as the 132/20 kV primary substation of Molini di Tures. 

The HV section is made up of two cable line arrival uprights (with use of a multifunction hybrid group), a simple sorting bar, two transformer uprights and a system for compensated earthing of the neutral conductor on the MV side. 

Construction of a single-storey building with an underground compartment for cable sorting 

20 kV department composed of 20 air-insulated compartments and new command, control and protection system.