New primary substation in mountain municipality, with single bar with air insulation, including two overhead line arrivals and two transformer bays.
Main components:
- 4 multifunction hybrid modules
- 2 transformers 132/15.6 kV 40/50 MVA
- Neutral compensation system
- 1 service building, hosting the air-insulated MV switchgear with vacuum circuit breakers and the protection and control system.
Services performed: documentation for requesting authorisations, plano-altimetric survey of the site