Design of connection works for passive users (data centers) with a power of 100 MW.
Double line in 132 kV underground cable with a 4.5 km route in rural and urban routes across 4 municipalities, including interference study (provincial and motorway roads; waterways)
132/30 kV air-insulated substation, composed of a single busbar, two line arrival uprights, 3 transformer uprights
Including assistance at the bodies responsible for issuing permits