Creation of connection works to the national grid for a 41 MW photovoltaic systemÂ
- New user substation with air insulation, including a line arrival bay, a 150/20 kV 40/50MVA transformer bay and auxiliary services
- 150 kV underground cable line for a total length of 3.8 km according to the crossbonding system
Services included: cable sizing; study of electromagnetic fields