Expansion of the 132/20kV power supply user cabin of the Maniago (PN) plant

Preliminary, definitive and executive design of the civil and electrical works for the expansion of the existing substation
Sum total of the work: € 2.500.000,00
Project: 2021
Work: 2022

Extension of the existing user transformation cabin, serving a foundry in Maniago. Single bar system with air insulation. Planned works:

  • Insertion of a new 132/20 kV 25 MVA transformer with relative stall 
  • Extension of the existing building to accommodate the new MV switchboards 
  • Replacement of the complete protective system of the entire cabin

Services provided: request for authorisations, relations with third parties (including Terna), plano-altimetric survey, study of protections