New 220 kV line in underground cable with use of the cross bonding system.
Route developed in a mountain area, mainly following public roads, in agreement with the relevant managing bodies. The use of sections with the aid of remote-controlled drilling is envisaged.
The sections near sensitive receiving points (houses) are protected by screening duct.
Length of the Austrian section: 11 km
Length of the Italian section: 40 km