Realizzazione ingressi linee 132 kV alla Stazione Elettrica di Cardano (BZ)
TERNA S.p.A. – Direzione Territoriale Nord Est

Construction of 132 kV line inputs at the Cardano Electrical Station (BZ)

Executive design of the foundations of the supports for a 132 kV overhead double circuit power line; construction management of civil works, foundations and works connected to the cable sections
Sum total of the work: €1,866,195.18 (work on cable lines) + €404,334.05 (work on overhead lines)
Project: 2016
Work: 2016 – 2017

Construction of new connections to the Cardano power station of two 132 kV power lines with a mixed overhead/cable-underground solution. 

Construction of 6 new double three-circuit line supports, 2 single three-circuit lines and 4 overhead line/underground cable transition truss supports: calculation and works supervision of the related special foundations on micropiles

Construction management of the civil works relating to the laying of the cable sections (double circuit for approximately 1 km).