Nuova Sezione MT Lasa
EDYNA s.r.l. – Bolzano

New Section MV Lasa

Executive project and coordination for safety in the design phase for the installation of a MV section in shelters and ancillary civil works
Sum total of the work: € 672.965,00
Project: 2015
Work: 2015 – 2017
Progress: work completed

Construction of a new MV section through the installation of two metal prefabricated structures (shelters) containing the 10 kV and 20 KV medium voltage electrical panels and the electrical panels and equipment necessary for the correct functioning and control of the two sections and the electrical lines at medium underlying voltage.

The intervention will be completed with the laying of the MV and LV lines for connection to the existing MV network and to the HV/MV transformer present in the adjacent primary substation