Intervention on an existing substation, currently structured with 4 line arrivals and 2 HV/MV transformers.
The complete renovation of the 132 kV department is planned through the construction of a double bar with bus-tie and the insertion of a third HV/MV transformer with a power of 40/50 MVA.
Complete renovation of the medium voltage, command and control, remote control and auxiliary services systems of the existing systems.
Demolition and reconstruction of the services building (two-storey prefabricated type).