Manutenzione straordinaria e potenziamento della Cabina Primaria 132/15,6kV di Cremona Ovest
Distribuzione Elettrica Cremona s.r.l.

Extraordinary maintenance and upgrading of the primary substation of "Cremona Ovest"

Executive project, works management, safety coordination in the design phase for the complete renovation of an existing cabin in operation
Sum total of the work: € 4.730.182,56
Project: 2014
Work: 2014 – 2018
Progress: work completed; plant in service

Intervention on an existing substation, currently structured with 4 line arrivals and 2 HV/MV transformers. 

The complete renovation of the 132 kV department is planned through the construction of a double bar with bus-tie and the insertion of a third HV/MV transformer with a power of 40/50 MVA. 

Complete renovation of the medium voltage, command and control, remote control and auxiliary services systems of the existing systems.

Demolition and reconstruction of the services building (two-storey prefabricated type).

en_GB