Nuova Cabina Primaria 132/20kV di Vicenza-Monte Crocetta.
SAR Servizi a rete s.r.l. – Vicenza

Construction of the new primary substation of Monte Crocetta in Vicenza (Italy)

Preliminary, definitive and executive design; coordination for safety during the design and execution phase, operational management of electromechanical works
Sum total of the work: € 6.360.990,00
Project: 2012 – 2015
Work: 2018-2021
Progress: work completed and tested

New primary distribution substation with traditional air-insulated system, single bar, with double cable line arrival stall (the third only in preparation) and three transformer risers.

  • 1 transformer 132/20 kV 40 MVA
  • 1 transformer 132/10 kV 40 MVA
  • 1 transformer 132/20/10 kV 63 MVA
  • Neutral compensation system
  • 1 two-storey building, hosting 35 air-insulated MV compartments with vacuum isolators as well as the protection and control system