Transition of the medium voltage distribution network relating to the Castelpietra power station from isolated neutral to compensated neutral, through the installation of two Petersen coils connected with a neutral forming transformer (TFN) to the relevant MV half-busbar.
The project, in addition to the technical solutions, envisaged the implementation methods, which will be: turnkey contract for the executive design, supply and installation of the electromechanical works; assignment in the economy of construction works