New 132/20kV industrial substation to connect VDP foundery in Schio (VI)
VDP Fonderia S.p.A. – Schio (VI)

Construction of the new HV/MV transformation cabin at the VDP foundry in Schio (Vicenza – Italy)

Design and construction management of a new 132 kV receiver unit to power the production plant (building and electromechanical works)
Sum total of the work: € 900.000,00
Project: 2011-2014
Work: 2015
Progress: work completed and tested

Construction of a new 132 kV receiving unit directly connected to a new line compartment at the ENEL primary substation in Schio located on the border with the plant.

  • 1 multifunction hybrid module 
  • 1 transformer 132/20 kV 25 MVA
  • 1 industrial-type building intended to house the protected MV compartments and the command and control panels